And we’re off - Feb 24
What a whirlwind it is been. So much so that we’ve almost forgotten to pop our heads up and say “We’re Open!”.
Here’s just a few of the renovation milestones we’ve achieved since September 2023:
Demo’d a lot of plaster walls
New paint on every wall
New lights
A million trips to Bunnings
Replaced carpet tiles
Installed some feature acoustic wall panelling (an absolutely amazing and practical feature)
Replaced some drop ceiling tiles
Removed and installed a new kitchen fitting in with our monochrome and (we think) stylish palette.
Replaced the kitchen floor with hybrid timber flooring.
Installed new privacy and heat reducing blinds to the meeting room and Suite 2.1
So, we’re excited to announce that as of now, February 24, we’re open to business for Desks for a Day.
Private Suites will be ready very soon (we’re going to say 4-6 weeks) once our lovely glass partitions are installed.
So although we’re ready for business now, consider it a soft launch. We’ll be fully ready for business after the partitions are up.
Craig